Legislative Information

WSU Budget Requests

Veterinary Medical Research Building

State of Washington

C 2 – CAPITAL PROJECT REQUEST

 

Budget Period:            2007-09

Agency:                         365        Washington State University

Version:                        05          FY2008 Supplemental Capital Budget

 

Project Number:

 2007-2-2009                                                                                                                           Agency Priority:                            1

Project Title:               WSU Pullman – Veterinary Medical Research Bldg: New                                                                                    

Description

 

Project Class:         2         Program                                                                                      

City: Pullman

Type of Project:     New Facilities/Additions (Major Projects)                             County:Whitman

OFM Priority:

 Postsecondary Learning

 Legislative District:        009

 

Project was requested in a previous biennium:   Yes

Previous Project ID:                              2004-2-009

Compliant with Growth Management Act:          Yes

 

Project Published Summary:

Funding is requested for a facility required to strategically advance WSU’s neuroscience research effort which is world class in the study of Brain, Behavior, and Performance.  This and other cutting-edge research in WSU’s College of Veterinary Medicine suffer from poor quality, fragmented, and limited space that impedes growth of pre-eminent programs.  Most of this proposed 128,000-gross square-foot Pullman laboratory facility will provide state-of-the-art space to support the interdisciplinary research and graduate education programs located in outmoded buildings that are more than a half century old.  Existing scientists are currently housed in Wegner, McCoy, and Bustad halls.  The project also includes vivarium and core laboratories to be shared across multiple WSU research programs including food safety, infectious disease, animal health, and bioengineering.  Design funding is requested toward construction of an $83.5 million building in 2009-2011.  Design funding could also be provided as one-time money in the supplemental operating budget.

 

Project Description:

 

This capital project alleviates the critical shortage of laboratory space available for veterinary medical research at Washington State University (WSU).  Poor quality space, fragmented space, and lack of space are impeding the growth of cutting-edge research programs within WSU’s College of Veterinary Medicine (CVM).  Most of this proposed 128,281 gross-square-foot Pullman laboratory facility will provide state-of-the-art research space to support interdisciplinary veterinary research and graduate education programs currently located in outmoded 50-year-old buildings.  Importantly, this facility will strategically advance WSU’s research strength in the Brain, Behavior, and Performance emphasis within the neurosciences, including collaborating faculty in Bioengineering.  The project also includes vivarium and core laboratories to be shared across multiple WSU research programs, including in food safety, infectious disease, and animal health.  Design funding is requested toward construction of an $83.5 million building in 2009-2011.

 

This project is part of a comprehensive master plan to correct long-standing and increasingly severe space limitations and infrastructure deficiencies within the CVM (especially for faculty located in Wegner, McCoy, and Bustad Halls).  It co-locates one of the strongest research programs at WSU, the Department of Veterinary & Comparative Anatomy, Pharmacology & Physiology (VCAPP), with other strong life science research units in the Research and Education Complex; consistent with WSU’s strategic plan, this co-location will foster the growth of collaborative, multi-disciplinary research and graduate education.

 

Major project outcomes and benefits to WSU, the state, and other stakeholders will be to:

-    provide existing scientists with modern space in which to conduct their cutting-edge research;

-    enable continued strong growth of research excellence in strategic research areas in the veterinary biomedical science and biotechnology areas (for example, diabetes, neuromuscular disorders, and heart disease) of vital importance to the health and well-being of animals;

-    provided research laboratory, support, and teaching spaces for professional education, research and graduate education (Veterinary Science, Neuroscience, and Bioengineering), and research-oriented undergraduate degree programs in Neuroscience and Bioengineering:

-    alleviate major HVAC deficiencies that limit the safe conduct of research in current space;

 

Critical space limitations are stalling research advances.  With an expanded professional teaching program, highly successful and expanding biomedical and biotechnology research efforts, and expansion of research-oriented undergraduate degrees in Neuroscience and Bioengineering, the growth of VCAPP programs has far outstripped the quantity and quality of available space.  The VCAPP Department is now scattered across several facilities that are substandard and inadequate, and have been patched together to make do.  Both Wegner and McCoy Halls have insufficient lab space and lack the air-handling capacity and other infrastructure needed for building occupant safety and expanded research.  Research progress is slowed and recruiting and retaining faculty is becoming increasingly difficult due to a space shortage and poor quality of what space there is.  WSU has reached the limits of temporary solutions achieved through minor increases in space obtained through costly renovation and reassignment of substandard spaces.

 

Alternatives.  Various alternatives were considered to accommodate the VCAPP program including an “no action” alternative.  The alternatives were deemed not viable due to age-condition of existing facilities, limited site area for expansions, lack of available surge space or research space elsewhere on campus; the “no action” alternative is not acceptable due to the strong growth of the program.

 

The project frees up existing space that can be renovated to meet other critical needs.  Completion of the Veterinary Medical Research Building to accommodate the needs of VCAPP frees up space for subsequent renovation of Wegner Hall to meet other needs of the CVM and the College of Pharmacy.  In addition, renovating space in Wegner Hall would provide a much-needed expansion of the Health Science Library until a permanent solution to its overcrowding can be developed.

 

 

Operating Impact

 

Fund                                                                                           Estimated

Code             Fund Title                                                                   Total                    2007-2009                  2009-2011          2011-2013 2013-2015                       2015-2017

 

                       Annual Average FTEs                                                    5.7                                                                                                      4.9             11.8                       11.8

001-01          General Fund-State                                            6,182,000                                                                                         1,066,000   2,558,000                       2,558,000

                                      Total Funds                                         6,182,000                                      0                                   0            1,066,000   2,558,000                       2,558,000                                                                              

 

 

 

Project Funding

 

                                                                                                                                                                               Expenditures                                  2007-09 Fiscal Period

Fund                                                                                                               Estimated                         Prior                       Current                                                           New

Code             Fund Title                                                                                       Total                 Biennium                   Biennium                Reapprops                       Approps

057-1            State Bldg Constr-State                                                      91,150,000                    250,000                                                                                                 7,400,000

                                      Total Funds                                                           91,150,000                    250,000                                   0                                  0                       7,400,000

 

 

 

 

Fund                                                                                                                                                                                                   Future Fiscal Periods

Code             Fund Title                                                                                                         2009-11                           2011-13                           2013-15                       2015-17

057-1            State Bldg Constr-State                                                                             83,500,000                                        0                                        0                       0

                                      Total Funds                                                                                  83,500,000                                        0                                        0                       0

 

 

 

 

Project Statistics

                                                                                           Total                                    Primary              Secondary

         

Gross Square Feet                                                                                                                    128,281                                    128,281                                0

Net Square Feet                                                                                                                          77,247                                       77,247                                0

Efficiency                                                                                                                                     60.2%                                        60.2%                         0.0%

Escalated MACC Cost per Sq. Ft.                                                                                                 388                                            388                                0

 

 

Project Schedule

                                                                                                                      Start Date                 End Date

Predesign                                                                                                                                                                                 08/01/2004             12/31/2007

Design                                                                                                                                                                                      04/01/2008             06/30/2009

Construction                                                                                                                                                                          09/01/2009             08/31/2011


 

Cost Summary

                                                                                          Total Escalated Cost                    % of Project

    Consultant Services                                                                                           6,390,000                                    7.0%

   

Pre-Schematic Design Services                                                                              235,000                                    0.3%

A/E Basic Design Services                                                                                  2,254,000                                    2.5%

A/E Extra Services/Reimbursables                                                                      2,267,000                                    2.5%

Other Services                                                                                                    1,317,000                                    1.4%

Design Services Contingency                                                                                317,000                                    0.3%

 

 

Construction                                                                                                    68,155,000                                  74.8%

 

MACC – Primary                                                                                              49,712,000                                  54.5%

MACC – Secondary                                                                                                          

GC/CM Risk Contingency                                                                                  2,510,000                                    2.8%

GC/CM or Design Build                                                                                     6,010,000                                    6.6%

Contingencies                                                                                                     4,983,000                                    5.5%

Sales Tax                                                                                                            4,940,000                                    5.4%

 

Other                                                                                                               16,605,000                                  18.2%

 

Acquisition                                                                                                                        

Equipment                                                                                                      11,554,000                                  12.7%

Equipment Tax                                                                                                      901,000                                    1.0%                        

Artwork                                                                                                                 218,000                                    0.2%                        

Agency Project Administration                                                                           3,738,000                                    4.1%

Other                                                                                                                     194,000                                    0.2%

 

                                               TOTAL ESCALATED COST                         91,150,000

Government and Academic Relations , 410 11th Ave. SE. Suite 102, Olympia, WA 98501, 360-956-2020, Fax 360-586-0665, Contact Us